
So, I am going to be doing my Hybrid Sweater, Wing-of-Moth shawl, and my vineland socks. I figured that the places they are all in that it would be enough for me to work on. Well, maybe not. I have 2 weeks to finish a sweater that is just about done, I just started the other shoulder, and so all I have to do on that is knit the rest of the shoulder, then the collar, then cast off and sew in all of the ends.
The shawl has more then half of the first chart done, and then I think I have maybe 2 charts left, and the pattern isn't super complicated. And then the socks just need a heel each (I do my socks 2 at a time, toe up, on magic loop, well when I can) and then a leg and cast off, and weave in ends.
And ok, this internet thing is really killing me. I want to look at ravelry and talk to all of my knitting and non knitting friends on skype and all of those aim and internet sites. However, out internet is still down, and I have another maybe 3 days of having to find free wifi. And so sitting here in Orchard Valley with my laptop out, headphones in, cell phone, sunglasses, coffee and knitting out, I get many looks. But they just don't get it. And I use my phone for pictures because I don't want to bring my big camera with me, and besides I have bluetooth on both the phone and m computer, so I might as well use it.
I have to get back to my olympic knitting, but what happens if I finish all of my projects (yeah right)?